PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the East Elevation 3.jpg Erecting the stone panels at the East Elevation 4.jpg Installed pipe hangers at the 1st floor Facing West.jpg Interior metal framing at the 2nd floor Facing West.jpg Runing split wire above the ceiling at the 1st floor Facing North.jpg Sprinkler branches at the 1st floor Facing North.jpg Fixed Low Roof Curbs Facing East (2).jpg Fixed low roof curbs Facing East.jpg Installing ductwork at the 4th floor Facing West.jpg
Previous pageNext page Runing split wire above the ceiling at the 1st floor Facing North
Runing split wire above the ceiling at the 1st floor Facing North